Van Heck Group
Moving water any way you want it
  • Home
  • Pumps and accessories
  • Projects
  • Sectors
  • News
  • About Van Heck
  • Contact
nl fr de

Projects

19 Jul

Renovation of Spijksterpompen pumping station

The Spijksterpompen pumping station near the Eemshaven is currently undergoing a major renovation. The adjacent dike is being widened simultaneously. Van Heck is closely involved in this project and supplied the temporary pumping installations for…

26 Jun

Red pumps to USA

Van Heck has a long-term contract with a large English client and this company uses Van Heck pumps for the jet trenching of cables for the wind farms. Up till now, this client’s main working…

13 Jun

Van Heck back to Norway for Statoil

In 2017, Van Heck made an important contribution to an ingenious Statoil project in Mongstad, Norway. Drilling heads to drill long pipelines through rocks were cooled with the water that the Van Heck pumps pumped…

24 May

Van Heck contributes to the renovation of a pumping station

Van Heck contributes to the renovation of a pumping station in the Vollenhove area in collaboration with our customer Bagger en Waterwerken Oosterwolde and the Water Board Waterschap Drents Overijssel Delta. Water must be pumped…

01 May

New sheet piling for Bremerhaven

Since October 2018 Van Heck has been working on a project in Bremerhaven, Germany. In the Bremerhaven harbour the customer is building a new sheet piling in a construction pit. The water must be pumped…

19 Apr

Van Heck resurfaces sunken dry dock

On a Saturday Mid-March we received a telephone call. In Den Oever a buoyancy chamber  of a dry dock had sunk. Our client called in Van Heck for a solution. The buoyancy chamber consists of…

22 Mar

High water levels in the region

On Monday March 11th round three p.m. we received a call from the Friesland Water Board, that pumping capacity was necessary at Ter Idzard. Heavy spring rains and stormy weather had caused the water levels…

11 Feb

Siphon Systems in Duqm

On June 25, 2018, a request came from our client. Ad Duqm is working on an immense port; The Port of Duqm. It is one kilometre long, 500 meters wide and 18 meters deep. The…

23 Jan

Van Heck contributes to wind farm

Van Heck is currently working on the first non-subsidized wind farm to be built in the sea. The ship from which work is carries out, is located near Borssele (Zeeland). On board of the ship…

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. ...
  11. 15
Home Projects
Icoon oplossingen - Van Heck Group

Cooperation

Cooperation is the key to our success: choosing for an innovative sustainable solution in good harmonization with the client.

Icoon lampje - Van Heck Group

Pragmatic and innovative

Inventing new applications for the ever-changing demands of our global customers is an ongoing process.

Icoon service - Van Heck Group

Our people, our culture

Our people are our company and our culture: professionalism, team spirit, perseverance and dedication to our work.

+31 (0)561 43 17 39
info@vanheckgroup.com
Ambachtsstraat 2, 8391 VK, Noordwolde (NL)
  • Twitter
  • LinkedIn
  • Facebook
  • YouTube
© 2023 Van Heck Group
  • Disclaimer
  • Privacy & cookies
  • Sitemap
Moving water any way you want it

IRO member - Van Heck Group       GreenAward-logo   vca-certification-van-heck