Van Heck contributes to the renovation of a pumping station in the Vollenhove area in collaboration with our customer Bagger en Waterwerken Oosterwolde and the Water Board Waterschap Drents Overijssel Delta.

Van Heck’s contribution

Water must be pumped from the polder to the canal, and vice versa.
To  accommodate the water capacity of the pumping station during the renovation, Van Heck supplied two silenced HK400 pumps. More than 100 meters of piping also went to Vollenhove, where it was professionally assembled by our service engineers. The project is running very smoothly and on schedule. Automation is currently being tested and next weekend the new pumping station will have to run on its own trouble-free.
If everything goes according to plan, Van Heck will dismantle her equipment next week.