Temporary diversion of the Ruiner Aa
At the beginning of the project Van Heck was on site to implement a temporary diversion of the Ruiner Aa by installing a siphon system of Ø 1000 mm with a flow rate of 4.000…
At the beginning of the project Van Heck was on site to implement a temporary diversion of the Ruiner Aa by installing a siphon system of Ø 1000 mm with a flow rate of 4.000…
Last week an emergency pump was prepared for Arcelor Mittal in Ghent.
For the development of a newly discovered oil field in the North Sea, Statoil Norway required a new pipeline for the transportation of crude oil.
Royal Smals asked Van Heck to supply a dewatering pump for the sand extraction project at the Milligerlake in Zwolle.
During the renewal of the weirs of the Peel Canal, the water must be temporarily diverted by using two Van Heck siphon systems,
As a result of the persistent rainfall and the fact that not all water trenches had been excavated thus hindering the drainage to the pumping station, the water at the Nieuwe Zeedijk in Holwerd was…
For a large offshore job in the Mediterranean Sea, near the Egyptian coast, Van Heck delivered the recently developed diesel driven HK800.
On Wednesday January 11th 2017 the Ministry of Water Management contacted Van Heck asking for assistance at the Heijen Harbour as a result of damage to the weir on the river Maas in Grave.
To enable renovation, a culvert must be drained. Contractor J. van den Brand BV asked Van Heck to supply a siphon system with a traffic bridge to redirect the water that normally flows through the…