Last week ICON Yachts in Harlingen urgently needed the red Van Heck equipment.
ICON Yachts had to empty their ship’s dock with approximately 25,000 m³ of water, in order to prepare it for the next ship.
Van Heck deployed two VSPH400 pumps, generators and the necessary piping to complete this order.
Within seven hours, the dock was empty and the dock block assembly for the new ship was ready to be installed. The dock was then filled with water again by gravity so that the new ship could enter.
The red pumps then emptied the dock again so that work on the ship can be carried out “on the dry”.