In 2021, Van Heck had carried out the engineering for a specific customer request, to supply a water monitor from our rental fleet for hosing down dredging equipment. This project was shelved until last week…
With a lead time of 3 working days, Van Heck has built a controllable water monitor on a Skid, together with our DPP300 – SC300.400 high-pressure pump.
Deployment of equipment
The customer will use the water monitor for hosing down dredging equipment at the Fehmarnbelt tunnel project (Denmark). The short lead time was possible because Van Heck always has a stock of high-pressure pumps, pipes, bends and fittings available for projects.
Do you have challenging jobs, specific questions or projects that require just a little more engineering? Ask Van Heck for the best solution without obligation; our engineers are ready for you!