Interim work in Grou, Haskerdijken and Grootegast

A number of pumping stations in Friesland will be replaced between September 2012 and March 2013. This interim assignment is perfect for Van Heck’s pumps.

Switch on and off

We’ll use the silenced HK400 – because of the built-up area nearby – and do the work while the Water Boards renovate the pumping stations. Water level sensors ensure that the pumps automatically switch on and off whenever necessary and the presence of a 24/7 warning system ensures that Van Heck’s operators will be onsite within an hour of a failure being reported.