In the evening of June 13th 2013, the Van Heck employees were called to prepare four HK700 pumps with a flow of 7.000 m³/h each, for fighting the flooding at the Elbe.
In the evening of June 13th 2013, the Van Heck employees were called to prepare four HK700 pumps with a flow of 7.000 m³/h each, for fighting the flooding at the Elbe.