A total of 150 lorries with pumps and in particular pipe work, arrived in Serbia.
The first pumps are operational and the Van Heck supervisors are working on installing the rest of the pumps and pipes.
A total of 150 lorries with pumps and in particular pipe work, arrived in Serbia.
The first pumps are operational and the Van Heck supervisors are working on installing the rest of the pumps and pipes.