For water company Waternet, an emergency pump (a diesel powered DPPG320-PHK500) including piping, was built up in Wilnis. The bearing block of a jackscrew pump station there had failed, making a rapid temporary pumping capacity necessary.

Within 24 hours of the initial contact with Waternet the pump was up and running. The pumping capacity is expected to be required for two months.

Once again a pleasant cooperation with Waternet!

back to overview